“Excellent service. Great communication and very competitive pricing. I called and discussed my project and within 5 days it was completed. Could not be happier.”Kevin K.Google review

Gravel driveways that still drain after the rain
Driveway turning to mud every time it rains? Potholes and ruts eating your truck's suspension? We build gravel driveways from the subgrade up so they drain, stay put and carry the trucks that use them.
- star rating on Google
- Free estimates
- Licensed and insured
- Family-owned · Moody, TX
The short answer
A gravel driveway is only as good as what's underneath it. Quinn Construction builds driveways the way roads are built: topsoil stripped, subgrade compacted, crushed-limestone base placed in compacted lifts, and a crowned surface so rain runs off instead of sitting in ruts. We also regrade and regravel worn drives across Central Texas. Free estimates: (254) 931-6044.
Most failing driveways around Central Texas were built by dumping rock on top of soil, and black clay pushes up through it after the first wet season. Quinn Construction builds driveways the way roads are built: we strip the topsoil, compact the subgrade, place crushed-limestone base in compacted lifts, and crown the surface so rain runs off instead of sitting in ruts.
We're a family-owned Central Texas land development company working out of our yard on State Highway 36 near Moody, with more than 20 years in construction. Because we also clear land and build metal shops and barndominiums, we often build the driveway as part of the same project. Call or text Chris at (254) 931-6044 for a free estimate on your gravel driveway installation.
Pick the gravel driveways page that matches your job
Each one has its own process, pricing factors and answers.
A bad driveway gets worse with every rain
Water is what ruins gravel driveways. Once a low spot holds water, every vehicle pushes rock down into soft clay and mud up into the rock. A pothole becomes a rut, the rut becomes a channel, and the base you paid for washes into the ditch. Catching it early means a regrade; waiting means rebuilding.
- Standing water, ruts or potholes after every storm
- Mud tracked into the house and trucks getting stuck
- Washboarding that rattles every trip in and out
- Gravel washed into the ditch or the yard, bare clay showing through
- You're building a new home, barndominium or shop and need concrete trucks and steel deliveries to reach the site
- You're selling property and the entrance is the first thing buyers see
A cleared lane and gravel drive to a ranch gateWhat our gravel driveway installation includes
A gravel driveway is a layered, compacted aggregate road: a firm subgrade, a structural base layer and a surface layer, shaped so water drains off. Here's how we build each layer.
Clearing and topsoil stripping
We clear the route of brush, stumps and roots, then strip the organic topsoil. Topsoil and roots compress and rot under load, and that's where most potholes start. If the route crosses wooded ground, we clear it as part of the job.
Subgrade shaping and compaction
The exposed subgrade is shaped to the driveway's grade and crown, then compacted. Where the driveway crosses a ditch, we set the culvert at this stage.
Crushed-limestone base in compacted lifts
The structural layer is crushed-limestone flexible base, the same family of material TxDOT specifies for roads. Base is placed in lifts and compacted at the right moisture so the crushed edges lock together. A compacted gravel driveway built this way doesn't shift or rut like loose rock.
Top rock, crown and drainage
We finish with a surface layer, crowned so rain sheds to the sides, and the shoulders and ditches are graded to carry the water away. Already have a driveway that's rutted or washing out? Our grading and regraveling service reshapes the surface and adds fresh gravel to bring it back to life.
The driveway problems we see most in Central Texas
Black clay pumping through the rock
Blackland Prairie clay, common east of I-35 and around Troy and Bruceville-Eddy, swells when wet and turns slick under load. Rock dumped straight onto it disappears within a season. Stripping topsoil, compacting the subgrade and placing enough base is what keeps a driveway on top of the clay.
Flat driveways that hold water
A driveway with no crown keeps rain on the surface, where traffic turns it into potholes. A crown of roughly half an inch to three quarters of an inch per foot is the usual guidance for aggregate surfaces.
Missing or undersized culverts
Where a driveway crosses a roadside ditch, it needs a culvert sized for the flow. Counties and cities have their own rules for pipe size and permits, and we'll point you to the right office.
Heavy trucks on a light driveway
Concrete trucks, steel deliveries, livestock trailers and hay trucks need more base than a passenger car. We size the base for the heaviest vehicle that will use the drive.
How our gravel driveway installation works
Five steps, from the route walk to the final grade.
Walk the route with Chris
Chris walks the driveway route with you to measure length and width and to check the soil, slope, low spots and where water crosses. You'll talk through turnarounds, parking pads, gates and what vehicles will use it. If the drive meets a county road or state highway, we'll flag the culvert or permit requirement then.
Get a written quote
Your quote lists the length, width, base material and depth, top surface, culvert and any clearing, with a price and expected days on site. You'll know exactly what's going under the rock.
Clear, strip and compact the subgrade
The crew clears the route, strips organic topsoil, shapes the subgrade to grade and crown, and compacts it. Culverts are set where ditches cross.
Place and compact the base
Crushed-limestone base goes down in lifts, each watered as needed and compacted so the stone locks together. We check the crown and grade as each lift goes in.
Top rock and final walkthrough
We place and compact the surface layer, dress the shoulders and ditches, and walk the finished driveway with you. Anything you want adjusted gets handled before we leave.
Free estimates. Chris Quinn answers the phone himself.
How much does a gravel driveway cost in Central Texas?
Gravel driveway cost depends mostly on what's under it: length and width, base depth, and how much clearing and dirt work the route needs. We quote each driveway after a walk-through so the price matches your ground, not an average. The biggest swing is usually the subgrade: firm limestone needs less base than wet black clay.
Every estimate is free, and we explain exactly what you're paying for. Request yours or call or text (254) 931-6044.
What moves a gravel driveways quote
- Length, width, turnarounds and parking pads
- Base depth needed for your soil and your heaviest vehicles
- Base and top-rock material, and the haul distance from the quarry
- Clearing, stump removal and topsoil stripping along the route
- Culverts and ditch work
- Slope and drainage work, such as wing ditches and low-water crossings
Why Central Texas homeowners choose Quinn for driveways
Anyone with a dump truck can spread rock. We build the layers under it.
Stripped, based, compacted, crowned
Every driveway gets topsoil stripped, a compacted subgrade, compacted limestone base and a crown that sheds water. That's the difference between a driveway that lasts and one you regravel every year.
Same crew that clears your lot
If you're building on raw land, we clear the homesite, build the driveway and can put up the barndominium or shop. One schedule and one point of contact.
Sized for your heaviest truck
We ask what will use the drive, from cars to concrete trucks to stock trailers, and build the base to carry it.
The owner on your property
Chris Quinn walks every driveway route and prices the job himself, so you deal with the person responsible for the work. We're licensed and insured.
One crew for the whole property

Lot clearing ahead of the driveway ›
A new driveway on raw land usually starts with clearing the route and the homesite at the same time, which saves a second trip.

A metal carport or garage at the end of it ›
A new drive is the right time to add covered parking or a shop, since the trucks that deliver the steel need the same road.

Forestry mulching along the route ›
Where the drive runs through cedar, mulching the edges opens the lane and keeps the soil in place.
Gravel Driveways across Central Texas
Serving all of Central Texas and surrounding areas. From our yard on State Highway 36 near Moody, SH 36 runs southeast to Temple and northwest to Gatesville, FM 107 reaches I-35 at Bruceville-Eddy, SH 317 connects McGregor and Belton, and I-35 takes us to Waco, Salado, Georgetown, Round Rock and Austin. Searching for a gravel driveway in Waco, driveway regrading near Temple, or a new drive for a homesite outside McGregor or Troy? On the limestone west of I-35 we often build on rock. On the black clay to the east, the subgrade work matters most.
- Moody
- Bruceville-Eddy
- Troy
- McGregor
- Waco
- Temple
- Belton
- Killeen
- Harker Heights
- Salado
- Gatesville
- Hewitt
- Lorena
- Marlin
- Rosebud
- Jarrell
- Georgetown
- Round Rock
- Hutto
- Liberty Hill
- Burnet
- Austin
Gravel Driveways questions, answered
It depends on length, width, base depth, and how much clearing and dirt work the route needs. A drive on firm limestone costs less than one on wet black clay, because clay needs more base and subgrade work. A walk-through gets you a written number.
Still have a question? Call or text Chris at (254) 931-6044, or read the general FAQs.
Free gravel driveways estimate
Tell us where the property is and what you want done. Chris walks it with you and gives you a written quote.
Request my free estimate (254) 931-6044- No obligation, no pressure
- Chris walks the property himself
- Written quote, line by line
“Chris exceeded our expectations. He completed the job thoroughly and timely, all with good communication throughout the process. Would definitely use them again.”Zach H.Google review
“The most important thing I like about this company is the owner. He was a respectable guy. Very clear and precise on phone. I was able to trust him to finish my project. He did a great job! He communicated with me along the way.”Linda A.Google review
Let's build a driveway that holds up after the rain
Tell us how long the drive is and what's going wrong with it, or where the new one needs to go. Chris will walk it and give you a written quote.
Call or text Chris(254) 931-6044- Free, written estimates
- Licensed and fully insured
- Family-owned, 20+ years in the trade



